ChinaWiki
Search
  • Home
  • All
  • Travel
  • Singers
  • Hot
  • Movie
  • Music
  • Personage
  • ScenicSpot
  • Food
  • Provinces
  • Opera
  • WebSite
  • Insurance
  • Banks
  • Dynasty
  • Hotels
  • Idiom
  • Schools
  • Performers
Home > List > Others > ScenicSpot

Huanghuayuan Bridge

Time: 2022-01-29 13:31:47 Author: ChinaWiki.net

Chongqing huanghuayuan bridge, located on the Jialing River in the main urban area of Chongqing, connects huanghuayuan in Yuzhong District and liaojiatai in Jiangbei District. Its completion greatly alleviates the traffic jam in Niujiaotuo Jialing River Bridge and Guanyin bridge area, and promotes the economic development of several main urban areas, especially Jiangbei District.

Huanghuayuan Jialing River Bridge

synonym

Huanghuayuan bridge generally refers to huanghuayuan Jialing River Bridge

Huanghuayuan Jialing River Bridge is a river crossing channel connecting Jiangbei District and Yuzhong District in Chongqing, China. It is located in the Jialing River waterway. It is the first bridge built in the main city of Chongqing after it was directly under the central government.

 

The construction of huanghuayuan Jialing River Bridge was started on December 26, 1996 and opened to traffic on December 26, 1999;

 

On February 20, 2013, the overall maintenance project was carried out; on April 18, 2013, the overall maintenance project was completed, and the bridge was put into operation again.

 

Huanghuayuan Jialing River Bridge starts from Jiangbei City West Street in the north, crosses Jialing River Waterway in the north and huanghuayuan interchange in the south. The bridge is 1208 meters long and the main bridge is 1023.32 meters long. The bridge deck is a two-way six lane urban trunk road with a design speed of 60 km / h.

 

Construction process

On December 26, 1996, the construction of Jialing River Bridge in huanghuayuan started.

 

On December 26, 1999, huanghuayuan Jialing River Bridge was opened to traffic.

 

On November 12, 2006, the north end of Jialing River Bridge in huanghuayuan was reconstructed.

 

On January 27, 2007, the bridge inspection of Jialing River Bridge in huanghuayuan was carried out.

 

On May 27, 2008, the safety inspection of Jialing River Bridge in huanghuayuan was carried out.

 

On February 20, 2013, the Jialing River Bridge of huanghuayuan was repaired as a whole, and the partial repair of the bridge structure was added;

 

On April 1, huanghuayuan Jialing River Bridge completed the maintenance of the left half of the road from Yuzhong to Jiangbei; on April 18, the overall maintenance of huanghuayuan Jialing River Bridge was completed, and the bridge was opened to traffic.

 

On December 15, 2015, the lighting test of Jialing River Bridge in huanghuayuan was carried out.

 

Bridge location

Huanghuayuan Jialing River Bridge is located in the north of Chongqing, China, connecting Jiangbei District and Yuzhong District. It is about 3.1km away from the upstream Jialing River Bridge in the East and 1.4km away from the downstream qiansimen Jialing River Bridge in the West. The bridge starts from Jiangbei Chengxi street in the north, crosses Jialing River Waterway in the upper and huanghuayuan overpass in the south, and passes through Yulu Avenue.

 

Architectural design

building structure

    Overall layout

    Huanghuayuan Jialing River Bridge is composed of main bridge, approach bridge and Interchange Ramps, and the section of main bridge is arranged from northeast to southwest.

     

      Design features

      The huanghuayuan Jialing River Bridge is a five span prestressed concrete continuous rigid frame bridge. It adopts three-dimensional prestressed system, with two upstream and downstream pairs. The approach bridge is a prestressed concrete hollow slab bridge. The main bridge deck takes the midpoint of the main bridge as the slope changing point, and each bridge box is designed as a single box single chamber section. The top flange plate of the box girder is set with a one-way cross slope to the outside, and the bottom edge of the beam changes according to a half cubic parabola. Due to the structural stress demand, four diaphragms are set at the junction of the main bridge and huanghuayuan interchange to connect the two bridge boxes, and the height from pier top to mid span beam changes according to the half cubic parabola.

       

      Design parameters

      Jialing River of huanghuayuan is 1208m long, the main bridge is 1023.32m long, with the span arrangement of (137.16 + 250 + 250 + 250 + 137.25m), and the approach bridge is 140m long, with the span arrangement of (35 + 35 + 35m). The overall width of the main bridge is 31 meters, the width of the carriageway is 24.5 meters, the width of the sidewalk is 2x2.5 meters, and the width of the central partition is 1.5 meters. The top surface of the box girder is 15.00 m wide and the bottom surface is 7.00 m wide. The beam height of the root section connecting each pier with the box girder is 13.80 meters, and the beam height of the cast-in-place beam section of each span and side span is 4.30 meters.

       

      Equipment and facilities

        Anti collision pontoon

        As of July 2014, FRP anti-collision pontoons have been installed at the piers of Jialing River Bridge in huanghuayuan to prevent the damage caused by the collision of ships passing through Jialing River.

         

          lighting

          As of November 2015, the huanghuayuan Jialing River Bridge has been equipped with landscape lighting, long pole street lights and other lighting facilities to embellish the beauty of the bridge.

           

            Light control system

            As of December 2016, multi Lane independent light control facilities have been installed at the south end of the huanghuayuan Jialing River Bridge to alleviate peak congestion.

             

            Operation

            Fare system

            On January 1, 2018, Chongqing Municipal People's government cancelled the collection of road and bridge tolls in the main urban area, including the huanghuayuan Jialing River Bridge.

             

            traffic flow

            As of February 2013, the average daily traffic volume of huanghuayuan Jialing River Bridge was 140000 vehicles.

             

            Construction achievements

            Technical problems

            The construction control of huanghuayuan bridge includes the following aspects: the research of main construction monitoring methods and the establishment of monitoring system, the development of control software, the creep and shrinkage test of C50 concrete, and the control of the main bridge.

             

            Scientific research achievements

            Honorary recognition

            Cultural characteristics

              Characteristic sidewalk

              The yellow garden Jialing River Bridge chooses colored floor tiles for the decoration of the sidewalk, and its fence is featured by the design of the Chinese zodiac, so as to form a characteristic sidewalk.

               

              Value significance

              Huanghuayuan Jialing River Bridge is a key project of Chongqing central trunk road, which is the most convenient channel connecting Yuzhong District, Jiangbei District and Nan'an District and crossing the urban peninsula. The completion of the bridge will greatly alleviate the traffic jam in Niujiaotuo Jialing River Bridge and Guanyin bridge area, and promote the economic development of several pedestrian areas in the main city, especially Jiangbei District. < I (review of Chongqing Evening News) < / I

               

              Address: Chongqing huanghuayuan Jialing River Bridge huanghuayuan bridge, Jiangbei District, Chongqing

              Longitude: 106.56711995602

              Latitude: 29.569122673556

Huanghuayuan Bridge


Chinese Edition

 

Ask a Question
Question Summary (100 characters)
Details (2,000 characters)
Name Country Email
 
Reply
Details (2,000 characters)
Name Country Email
Captcha captcha
Related Articles
  • 1.Dongshi

    Dongshi - Dong Shi

    Time 2021-02-24
  • 2.Iron Buddha Temple

    Iron Buddha Temple - Tie Fo Si

    Time 2021-02-25
  • 3.Zhoulonggang site

    Zhoulonggang site - Zhou Long Gang Yi Zhi

    Time 2021-02-25
  • 4.Phoenix path

    Phoenix path - Feng Huang Jing

    Time 2021-02-26
  • 5.Dongshi Township

    Dongshi Township - Dong Shi Xiang

    Time 2021-02-28
  • 6.Crescent Bay

    Crescent Bay - Yue Ya Wan

    Time 2021-03-01
  • 7.Xanadu Grand Theater

    Xanadu Grand Theater - Shi Wai Tao Yuan Da Ju Yuan

    Time 2021-03-01
  • 8.Namsan Park

    Namsan Park - Nan Shan Gong Yuan

    Time 2021-03-01
  • 9.Zhongshan Square

    Zhongshan Square - Zhong Shan Guang Chang

    Time 2021-03-01
  • 10.The king of azalea

    The king of azalea - Da Shu Du Juan Wang

    Time 2021-03-01
  • 11.Qiu Yanshan Zhou Enlai in danger

    Qiu Yanshan Zhou Enlai in danger - Qiu Yan Shan Zhou En Lai Yu Xian Di

    Time 2021-03-01
  • 12.Shaliuhe scenic spot

    Shaliuhe scenic spot - Sha Liu He Jing Qu

    Time 2021-03-02
Website directory
About
News
History
Culture
Laws
Others
LearningChineseMandarin
About Us Privacy
Copyright © 2019-2025 chinawiki.net All rights reserved. China, an ancient and beautiful oriental country.