Wulin gate Wharf

Wulin gate Wharf

Wulinmen passenger terminal has a wide layout: the total length of the Quay Line is 198 meters, which was completed in September 1976; the waiting hall was completed in December 1978, which adopts a grid structure, and the glass curtain wall receives the bright light pouring in from all around, making the whole hall square and spacious. At that time, the wharf construction cost 1 million yuan.

The ancient Hangzhou city is a water city, with countless revetments and wharves on both sides of the water. Wulin gate Wharf - in terms of time, it is closest to us. The former Hangzhou passenger terminal was in maiyuqiao. In 1978, a new Wulinmen terminal was built, and the water passenger transport center was moved here.

The total construction area of Wulinmen passenger terminal is 3925 square meters, which is the largest passenger terminal on the river in the province. The reason why the builders spared no effort in the design and construction of this passenger terminal is that two landmark buildings, long live Mao Zedong Thought exhibition hall and Hangzhou theater, have started construction one after another. When building a wharf at this time point, we should, of course, pay attention to coordination with it. We should not be stingy and shy.

 

Address: No.208, Huancheng North Road, Wulin business district, Gongshu District, Hangzhou City, Zhejiang Province

Longitude: 120.162244

Latitude: 30.274173

Tel: 0571-85190851

0 Questions

Ask a Question

Your email address will not be published.

captcha